Recently added articles from Engineered Systems:
Dealing with ACES: can we draw some conclusions from a quick survey about the Energy Act?(Editor's Note)
Aug 01, 2009; ... The timing of our June newsletters coincided perfectly with the House of Representatives' vote on the American Clean Energy & Security Act of 2009 (ACES). So to strike while the cyber-iron was hot, I included our first-ever reader surveys in both the Controlling Interest and Clean Air ...
ES events.(Conference news)(Calendar)
Aug 01, 2009 ... SEPTEMBER 29-30 Green Intelligent Buildings Conference Santa Clara, CA. Sponsored by Lumisys, ...
ES Webinars.(Calendar)
Aug 01, 2009 ... All webinars are free. Registration and archives at http://webinars.esmagazine.com AUGUST 27 "Optimized Controls for Delivery of Sustainable High Performance Buildings" ...
Engineering in the construction phase.(Back 2 Basics: Based on Cx-3 ATC/FPT and TAB-3 software)
Aug 01, 2009; ... * The designer should manage the design phase fee so that he has adequate funds to participate in the field coordination drawing phase of construction. Refer to "Design & Construction Administration for the 21st Century" in the August 2007 issue of Engineered Systems for more information ...
Third-party Cx and TAB engineering in the construction phase.(Back 2 Basics: Based on Cx-3 ATC/FPT and TAB-3 software)
Aug 01, 2009; ... * Those who contract for commissioning serves in the construction phase of the job usually interpret commissioning as being startup. When the commissioning firm is hired at that point in time to perform functional performance testing (FPT), experience has shown that this approach to ...