Article: Endesa Starts up the First Gas Turbine of Gran Canaria's CCGT.

Business Editors

MADRID, Spain--(BUSINESS WIRE)--Aug. 6, 2003

-- With 70 MW of installed capacity, it is the first of three

turbines (two gas turbines and one steam turbine) that will

compose the new CCGT in Gran Canaria.

-- Until the start of the combined cycle system, expected for the

second half of 2004, the turbine will operate as open cycle.

Related newspaper, magazine, and journal articles:

 
 
Newsweek Harper's Magazine The Washington Post Chicago Tribune Crain's Chicago Business PRNewswire Pediatric News The Nation Advertising Age The Economist (US) A FREE trial gives you access to over 80 million articles! Access over 6,500 publications with a FREE trial!