Magazine article from our research archive:
|
|
Dual test roles.(An exclusive interview with a test engineer)(Interview)
- Article from:
-
Test & Measurement World
- Article date:
-
September 1, 2005
|
Copyright informationCOPYRIGHT 2005 Reed Business Information, Inc. (US). This material is published under license from the publisher through the Gale Group, Farmington Hills, Michigan. All inquiries regarding rights should be directed to the Gale Group. (Hide copyright information)
|
Dave Olson is a product and test engineering manager at Philips Semiconductors (Tempe, AZ). He divides his time between evaluating new products, developing hardware and software for offshore production, and managing the engineers in his group.
He also was instrumental in developing software that lets engineers reuse instrument settings and drivers in numerous tests. (For a description of the application, see "Save settings, save time," Test & Measurement World, April 2003, www.tmworld.com.archives.)
T & MW: What products do you test?
Olson: All of the devices we test use the [I.sup.2]C bus. Products range from multiplexers to LED blinkers. My most recent product ...
Related newspaper, magazine, and journal articles:
|
'Power generation up by 1898.7 mw'
The Hindustan Times;
November 27, 2006 ;
177 words
......Sunday claimed to have achieved an increase of 1898.7 MW in power generation from various sources during the past year. The increase has been attributed to 1000 MW Indira Sagar Project, 826.5 MW from the Sardar Sarovar Hydroelectric Power Project...
|
|
INDIAN GOVERNMENT: 2033 MW generation capacity added in five weeks.
M2 Presswire;
March 10, 1999 ;
189 words
......PRESSWIRE-10 March 1999-INDIAN GOVERNMENT: 2033 MW generation capacity added in five weeks...Generation Capacity Addition has recorded 2033 MW in a span of five weeks. The NTPC in Central Sector has contributed 615 MW by advancing the date of commissioning of...
|
|
STATE SEEKS 2400 MW FROM CENTRAL UNITS
The Hindustan Times;
July 13, 2006 ;
488 words
......with the Central Government for allocation of around 2,400 MW of power from the upcoming Central Sector hydel and thermal...The present peak hour power demand of the State is 720 MW to 750 MW, whereas it needs 450 MW of power during the off peak hours...
|
|
European Record for Wind Power: Over 6,000 MW Installed in 2005.
PR Newswire Europe;
February 3, 2006 ;
473 words
......wind energy market show that cumulative wind power capacity increased by 18% to 40,504 MW (megawatt) at the end of 2005, up from 34,372 MW at the end of 2004. 6,183 MW of wind power capacity were installed last year, representing a wind turbine manufacturing...
|
|
IBERDROLA RENOVABLES Commissions A 99 MW Wind Farm In The US
Targeted News Service;
November 20, 2008 ;
278 words
......Minnesota, with installed capacity of 99 megawatts (MW). The facility, with 66 General Electric 1.5 MW wind turbines (nominal capacity), will enable...largest player. Today the Company already has 2,318 MW** of capacity installed in the US, with an additional...
|
|
EDF AUCTIONS OFF 6,000 MW OF PRODUCTION CAPACITY.
Europe Energy;
June 15, 2001 ;
373 words
......confirmed plans to auction off 6,000 megawatts (MW) of production capacity in the context of...German generator EnBW, a first sale of 1,200 MW being scheduled for September. These energy...released by Electricite de France: 4,000 MW of base load (electricity generated continuously...
|
|
POWER CPSUS SIGN MOUS WITH ARUNACHAL PRADESH FOR 15000 MW PROJECTS
The Hindustan Times;
September 22, 2006 ;
468 words
......development of hydro electric projects to the tune of 15,000 MW were signed in Itanagar, between the Government of Arunachal...NTPC will be taking up implementation of Etalin (4000 MW) and Attunli (500 MW) hydroelectric projects, NHPC will be taking up implementation...
|
|
Enel Acquires A Wind Pipeline Up To 1400 MW In Greece
US Fed News Service, Including US State News;
July 28, 2008 ;
344 words
......participate in wind pipeline projects up to 1400 MW throughout Greece by acquiring a 30% stake...participate to the development of additional 180 MW in Bulgaria, in an area adjacent to Thrace...in Thrace, where Enel already operates 63 MW, in Peloponnesus and in Evia, where Enel...
|
|
Country again reeling under 300 MW load shedding, THE INDEPENDENT
The Independent (Bangladesh);
May 14, 2000 ;
448 words
......country has again been reeling under 200 to 300 MW load shedding, including nearly 180 MW in the areas under the Dhaka Electric Supply Authority...units of Ghorashal power station having a total 420-MW capacity. The 210-MW fifth unit of Ghorashal went...
|
|
Investcorp Acquires MW Manufacturers, Inc. From Fenway Partners for...
PR Newswire;
January 23, 2003 ;
700+ words
......investment group, today announced that it has purchased MW Manufacturers, Inc. ( MW ) from Fenway Partners, Inc., a private equity investment firm, for approximately $188 million. MW is a leading manufacturer and distributor of windows...
|
|
India added 9,050 MW power capacity this year
The Hindustan Times;
December 29, 2007 ;
174 words
......Syndication. New Delhi, Dec. 29 -- India added a total of 9,050 MW power generation capacity this year between Jan 1 and...requirement, the power ministry said. This includes 6,645 MW of thermal, 2,185 MW hydro and 220 MW of nuclear power, the ministry said...
|
|
Power generating capacity to increase to 22,000 MW. (Pakistan power...
Economic Review;
October 1, 1994 ;
700+ words
......investors in end September to produce 3507 MW power. The development was quickly followed...Pakistan and Sindh for establishing a 5,280 MW coal fired power complex at Karachi coast...the power generating capacity to 22,000 MW by the year 2,000 under its comprehensive...
|
|
Maxim Power Corp. ("MAXIM") Announces Acquisition of Three Power Plants...
Canadian Corporate News;
September 17, 2007 ;
634 words
......JCP&L ) to acquire the 86 megawatt ( MW ) Forked River Power Station, located in...turbine technologies and a total of 213 MW of electric generating capacity. MAXIM's...be comprised of 4 power plants having 266 MW of electric generating capacity. Acquisition...
|
|
Torrent Power plans to generate over 8600 MW
The Hindustan Times;
August 4, 2008 ;
465 words
......installed generating capacity of over 8,600 MW. On completion, it stands to join a league...include a generation upgrade at the 1,147.5 MW gas-based combined cycle power project coming...Sujen in Surat district by another 3,000 MW. The land acquisition process has commenced...
|
|
Maxim Power Corp. ("MAXIM") Announces Acquisition of Three Power Plants...
CCNMatthews Newswire;
September 17, 2007 ;
604 words
......Company ("JCP&L") to acquire the 86 megawatt ("MW") Forked River Power Station, located in...turbine technologies and a total of 213 MW of electric generating capacity. MAXIM's...be comprised of 4 power plants having 266 MW of electric generating capacity. Acquisition...
|
See all results.
Or, try our
Advanced Search.
|