Article: Aramco gears up for Manifa drilling.(Saudi Arabian Oil Co.)

Saudi Aramco is expected to issue a tender by early June for a contract to carry out a 3D/2D seismic survey of the Manila field in the Eastern Province, as part of its redevelopment plan. A capital expenditure of at least $1,000 million is planned to initially produce 300,000 barrels a day (b/d) of Arabian Heavy crude.

Aramco plans to increase capacity, in stages, to about 1 million b/d. The offshore field is planned to be brought into full production by 2009/10 (MEED 13:1:06).

Located southeast of Safaniya, the Manila field was first brought into production in 1964 through the drilling of eight wells. However, the facilities were mothballed soon after.

Related newspaper, magazine, and journal articles:

 
 
Newsweek Harper's Magazine The Washington Post Chicago Tribune Crain's Chicago Business PRNewswire Pediatric News The Nation Advertising Age The Economist (US) A FREE trial gives you access to over 80 million articles! Access over 6,500 publications with a FREE trial!