|
|
Article: Paramount Gold Drills Multiple High-Grade Intercepts, Including 874 Grams Per Tonne (28 Ounces) Silver Over 5.2 Meters and 553 Grams Per Tonne (17.8 Ounces) Silver Over 6.5 Meters at Their San Miguel Project, Mexico.
- Article from:
- Business Wire
- Article date:
- September 13, 2006
CopyrightCOPYRIGHT 2006 Business Wire. This material is published under license from the publisher through the Gale Group, Farmington Hills, Michigan. All inquiries regarding rights should be directed to the Gale Group. (Hide copyright information)
|
CHIHUAHUA, Mexico -- Paramount Gold Mining Corp. (OTC:PGDP)(FWB:P6G) (WKN:A0HGKQ), is pleased to report multiple high-grade silver intercepts from nine drill holes on its ongoing drill program at the San Miguel project located near Temoris, Chihuahua, Mexico. Ten silver intercepts ranged from 105 grams per tonne silver to 874 grams per tonne (g/t) across lengths ranging between 2 and 47 meters. The results from four of these drill holes represent the initial testing on the San Jose zone which is located immediately adjacent to the south side of the San Luis Mine zone where Paramount previously reported 35.5 g/t gold with 17 g/t silver over 4.0 meters in drill hole SL-02 ...
Related newspaper, magazine, and journal articles:
|
|
Article: Continuum Reports Results of DDH SJO-10 at the San ...
Canadian Corporate News;
December 7, 2004 ;
700+ words
... ... hole SJO-10 at the San Jose project in Oaxaca ... 321.0-325.9 meters and returned an average ... interval includes a 1.6 meter core length (1 ... 321.0 and 322.6 meters grading 6.32 gpt ... mineralization at San Jose is hosted by three ...
|
|