|
|
First Nickel Reports Additional Positive Drill Results at Lockerby Mine.
- Article from:
-
Canadian Corporate News
- Article date:
-
October 10, 2006
|
Copyright informationCOPYRIGHT 2006 Canadian Corporate News. News Provided by Comtex. This material is published under license from the publisher through the Gale Group, Farmington Hills, Michigan. All inquiries regarding rights should be directed to the Gale Group. (Hide copyright information)
|
TORONTO, ONTARIO, Oct 10, 2006 (CCNMatthews via COMTEX) -- First Nickel Inc. (TSX:FNI) reports the balance of results from the phase one 2006 diamond drilling program completed this summer at Lockerby Mine.
First Nickel has now received all the analytical results for nickel and copper for the first phase of diamond drilling on the Lockerby Depth and Lockerby East zones. The first phase consisted of a total of 113 holes representing 19,736 metres of diamond drilling (Lockerby Depth Zone: 58 holes, 10,819 metres; Lockerby East Zone: 55 holes, 8,917 metres). Results from 23 holes (FNI6301 to FNI6323) on the Lockerby Depth Zone were reported in a release dated May 29, 2006 ...