Press release article from our research archive:

Mechel Announces Start to Construction of Railroad to the Elga Deposit.

MOSCOW, Feb. 21 /PRNewswire-FirstCall/ -- Mechel OAO , one of the leading Russian mining and metals companies, announces that it has signed a contract and is starting construction of a railway spur track to the Elga coal deposit (Yakutia).

The contract for designing and constructing the railway spur track to connect Ulak railroad station of the Baikal-Amur Mainline with the Elga coal deposit (Yakutia) was signed between Mechel and Transstroy Engineering Corporation, a subsidiary of Transstroy Design and Construction Company, on February 19.

The total length of the railroad will be approximately 315 kilometers. The railroad's design comprises about 420 engineering ...

Related newspaper, magazine, and journal articles:

See all results. Or, try our Advanced Search.

Newsweek Harper's Magazine The Washington Post Chicago Tribune Crain's Chicago Business PRNewswire Pediatric News The Nation Advertising Age The Economist (US) A FREE trial gives you access to over 60 million articles! Access over 3,500 publications with a FREE trial!