|
|
Article: Alternative Method Controls Stormwater.
- Article from:
- Construction Bulletin
- Article date:
- May 19, 2008
- Author:
CopyrightCOPYRIGHT 2008 Reed Business Information, Inc. (US). This material is published under license from the publisher through the Gale Group, Farmington Hills, Michigan. All inquiries regarding rights should be directed to the Gale Group. (Hide copyright information)
|
Story by Richard Parrish
A new Learning Center was the first school of its type to have an advanced underground stormwater system.
Excavation and installation of an advanced underground stormwater system by St. Paul Utilities (SPU) comprised a major portion of the recent construction at the Alternative Learning Center in the Midway area of St. Paul, Minnesota. The company also recently completed a challenging installation of a water main, along with sanitary and storm sewer systems, at the new Little Six Casino in Prior Lake, Minnesota.
The Alternative Learning Center is the first school of its type in the capital city's school system to use an ...