|
|
Article: Australia : Chevron Australia starts gas production from $2.1B onshore LNG facility.
- Article from:
- TendersInfo
- Article date:
- September 4, 2008
CopyrightCOPYRIGHT 2008 Al Bawaba (Middle East) Ltd. This material is published under license from the publisher through the Gale Group, Farmington Hills, Michigan. All inquiries regarding rights should be directed to the Gale Group. (Hide copyright information)
|
Byline: manish03
Chevron Corp.s subsidiary, Chevron Australia Pty Ltd., has produced first gas from the North West Shelf Ventures Train 5 onshore liquefied natural gas (LNG) facility at the Karratha Gas Plant in Western Australia.
The US $2.1 billion is expected to increase the joint ventures export capacity by up to 4.4 million tonnes of LNG annually to 16.3 million tonnes.
The Train 5 expansion includes: a fifth LNG processing train, a jetty extension and second LNG loading berth, two additional power generation units, a third LPG fractionation unit, a new fuel gas compressor, an acid gas removal unit and a third boil off gas compressor.
...