|
|
Article: Chile : Polar Star-Completes Phase I Due Diligence Drilling at the Chepica Project.
- Article from:
- TendersInfo
- Article date:
- January 12, 2009
CopyrightCOPYRIGHT 2009 Al Bawaba (Middle East) Ltd. This material is published under license from the publisher through the Gale Group, Farmington Hills, Michigan. All inquiries regarding rights should be directed to the Gale Group. (Hide copyright information)
|
Byline: pinto03
Star Mining Corporation announces final results from sixty-five shallow diamond drill holes totalling 6,758 meters completed in late November 2008 on the Chepica No.1 and No.2 Vein systems as part of its ongoing due diligence review of the Chepica mining property and mill (the "Chepica Project"), Talca, Region VII, Chile. Results from the first 30 holes were the subject of Polar Star's October 22, 2008 press release with the remainder covered by this release.
Highlights
49 holes totalling 5,274 meters on the Chepica No.1 Vein system, covering 330 meters of strike and to 180 meters depth.
16 holes totalling 1,484 meters ...