Article: M-53 Upgrade Includes Interchange Reconstruction.(Dan's Excavating, Inc)(Editorial)

By Aram Kalousdian, Editor

New load and resistance factor design dynamic pile testing specification used on bridge

An approximately $13.5-million upgrade of M-53 from 24 Mile Road to 27-1/2 Mile Road in Macomb County, MI, includes reconstructing the inner and outer shoulders on north and southbound M-53, overlaying M-53 with asphalt, and reconstructing the M-53/26 Mile Road interchange. This section of M-53 is currently a divided concrete highway and is two lanes in each direction. The interchange will include a roundabout at each end of the bridge that will tie in the on and off ramps.

The M-53 portion of the project is 3.5 miles long. Dan's ...

Related newspaper, magazine, and journal articles:

 
 
Newsweek Harper's Magazine The Washington Post Chicago Tribune Crain's Chicago Business PRNewswire Pediatric News The Nation Advertising Age The Economist (US) A FREE trial gives you access to over 80 million articles! Access over 6,500 publications with a FREE trial!