|
|
Article: Contractor and engineer team up so Pittsburgh school opens on time.(FOCUS: DUCTLESS A/C SYSTEMS)(McCormick Elementary School)(Moon Area School District)
- Article from:
- Air Conditioning, Heating & Refrigeration News
- Article date:
- April 27, 2009
- Author:
CopyrightCOPYRIGHT 2009 BNP Media. This material is published under license from the publisher through the Gale Group, Farmington Hills, Michigan. All inquiries regarding rights should be directed to the Gale Group. (Hide copyright information)
|
PITTSBURGH -- The school market has something of a delayed reaction to the economic climate because most of the operational work has already been set in motion due to budget planning. This has been good news for contractors doing mechanical work for schools.
In 2006, the Moon Area School District (MASD) completely renovated McCormick Elementary School, which is located 15 miles northwest of Pittsburgh. Despite completion of major construction, Alan Criswell, MASD supervisor of buildings and grounds, had an extremely tight schedule for the HVAC system installation. It was May 2007, and he needed to have the equipment in place and operating for the August school ...
Related newspaper, magazine, and journal articles:
|
|
Article: Recker surviving at Iowa Ailing knee small trouble as ...
Chicago Sun-Times;
January 11, 2001 ;
700+ words
...IOWA CITY The way Luke Recker sees it, the painful tendinitis in ... his family and Big Ten basketball. Recker figures the knee will be only about ... be it." At Penn State on Saturday, Recker scored 15 of his 20 points in the second ...
|
|