|
|
Article: CGTEE, Alstom sign USD 56.3m contract for boilers at Candiota TPP.
- Article from:
- ADP News Latin America
- Article date:
- September 1, 2009
CopyrightCOPYRIGHT 2009 Aii Data Processing Ltd. This material is published under license from the publisher through the Gale Group, Farmington Hills, Michigan. All inquiries regarding rights should be directed to the Gale Group. (Hide copyright information)
|
(ADPnews) - Sep 1, 2009 - Brazilian unit of French heavy engineering group Alstom and Brazilian utility Companhia de Geracao Termica de Energia Eletrica (CGTEE) signed a BRL 105.8 million (USD 56.3m/EUR 39.2m) contract for recovery boilers at Candiota thermoelectric power plant (TPP).
The contract was signed yesterday by CGTEE, Alstom Power Systems SA - France and Alstom Brasil Energia e Transportes ...
Related newspaper, magazine, and journal articles:
|
|
Article: Eletrobras swings to USD 1.133bn net loss Q2 '09.(Financial ...
ADP News Latin America;
August 19, 2009 ;
628 words
... ... part of Brazil's energy generation and transmission systems via its subsidiaries Chesf, Furnas, Eletrosul, Eletronorte, CGTEE and Eletronuclear. Furthermore, Eletrobras has a 50 pct stake in Itaipu Binacional, which operates the world's largest ...
|
|