|
|
Article: BRIEFING - ASIA ENERGY - OCT 14, 2009.
- Article from:
- AsiaPulse News
- Article date:
- October 14, 2009
CopyrightCOPYRIGHT 2009 Asia Pulse Pty Ltd. This material is published under license from the publisher through the Gale Group, Farmington Hills, Michigan. All inquiries regarding rights should be directed to the Gale Group. (Hide copyright information)
|
An executive briefing on energy for Oct 14, 2009, prepared by Asia Pulse (http://www.asiapulse.com), the real-time, Asia-based wire with exclusive news, commercial intelligence and business opportunities.
PAKISTAN TO INSTALL TWO POWER UNITS OF 480 MW AT TARBELLA DAM
ISLAMABAD - The National Assembly was informed Monday that two power units of 480 megawatts each are to be installed at Tarbela Dam to overcome power shortage on long-term basis.
Minister for Water and Power Raja Pervez Ashraf told the House during question House that the World Bank has shown willingness to provide assistance for preparation of detailed engineering design, tender ...