|
|
Article: SilverCrest Reports Pre-Production In-Fill Drill Results at Santa Elena; 22m Grading 6.37 g/t Au and 72.7 g/t Ag.
- Article from:
- Marketwire Canada
- Article date:
- November 5, 2009
CopyrightCOPYRIGHT 2009 Canadian Corporate News. News Provided by Comtex. This material is published under license from the publisher through the Gale Group, Farmington Hills, Michigan. All inquiries regarding rights should be directed to the Gale Group. (Hide copyright information)
|
VANCOUVER, BRITISH COLUMBIA, Nov 5, 2009 (Marketwire via COMTEX) -- SilverCrest Mines Inc. (the "Company") (TSX VENTURE:SVL) is pleased to report that a pre-production in-fill drilling program at the Santa Elena Project located in Sonora, Mexico has been completed.
The 11 in-fill reverse circulation holes (total of 577 metres, to view attached drill plan for hole locations please click on the following link: http://media3.marketwire.com/docs/1svl114.pdf) reported below are located in the Phase I pit which represents approximately the first two years of planned metal production. The most notable intercepts of this near surface series of holes were encountered in ...