Article: SilverCrest Reports Pre-Production In-Fill Drill Results at Santa Elena; 22m Grading 6.37 g/t Au and 72.7 g/t Ag.

VANCOUVER, BRITISH COLUMBIA, Nov 5, 2009 (Marketwire via COMTEX) -- SilverCrest Mines Inc. (the "Company") (TSX VENTURE:SVL) is pleased to report that a pre-production in-fill drilling program at the Santa Elena Project located in Sonora, Mexico has been completed.

The 11 in-fill reverse circulation holes (total of 577 metres, to view attached drill plan for hole locations please click on the following link: http://media3.marketwire.com/docs/1svl114.pdf) reported below are located in the Phase I pit which represents approximately the first two years of planned metal production. The most notable intercepts of this near surface series of holes were encountered in ...

Related newspaper, magazine, and journal articles:

 
 
Newsweek Harper's Magazine The Washington Post Chicago Tribune Crain's Chicago Business PRNewswire Pediatric News The Nation Advertising Age The Economist (US) A FREE trial gives you access to over 80 million articles! Access over 6,500 publications with a FREE trial!