Article: BASF builds incinerator in Brazil

BASF Brasileira SA (Brazil), the plastics manufac turer, is building an industrial waste incinerator at its site at Guaratingueta, in the Sao Paulo region of Brazil. The plant will cost about DM10 million ($5.7 million) and have a capacity of 2,400 tonnes a year, BASF told Haznews. Much of the waste to be treated will be chlorinated organics. Planning for the inciner ator has been done in close co-operation between BASF Brasileira and the Central Engineering and Environmental Protection Division at BASF's head quarters in Ludwigshafen, Germany.

The incinerator is expected to be finished in 2 years time, and will serve the other BASF Group produc tion sites in Brazil, ...

Related newspaper, magazine, and journal articles:

 
 
Newsweek Harper's Magazine The Washington Post Chicago Tribune Crain's Chicago Business PRNewswire Pediatric News The Nation Advertising Age The Economist (US) A FREE trial gives you access to over 80 million articles! Access over 6,500 publications with a FREE trial!