Article: Argentina Gold: Hole 85: 155 Meters of 2.2 g/t Gold and 80.3 g/t Silver Including 83 Meters of 3.1 g/t Gold and 110.4 g/t Silver.

VANCOUVER, British Columbia--(BUSINESS WIRE)--Nov. 4, 1998-- Argentina Gold Corp. (VSE:ARP.) (the "Company") is pleased to announce the results of Hole 85 drilled on the Amable target at the Veladero project in San Juan, Argentina.

Hole 85 returned 220 meters of 1.7 g/t gold and 69.81 g/t silver including a 155 meter section of 2.15 g/t gold and 80.29 g/t silver and an 83 meter section of 3.07 g/t gold and 110.41 silver. Hole 85 was drilled 80 meters west of and in section with Hole 80 defining an east-west high-grade mineralized section with an extent of more than 150 meters. The entire length of the hole was mineralized down to its total depth of 378 meters. ...

Related newspaper, magazine, and journal articles:

 
 
Newsweek Harper's Magazine The Washington Post Chicago Tribune Crain's Chicago Business PRNewswire Pediatric News The Nation Advertising Age The Economist (US) A FREE trial gives you access to over 80 million articles! Access over 6,500 publications with a FREE trial!