Article: Due-date determination with resequencing.
- Article from:
- IIE Transactions
- Article date:
- February 1, 1999
- Author:
CopyrightCOPYRIGHT 1999 Institute of Industrial Engineers, Inc. (IIE). This material is published under license from the publisher through the Gale Group, Farmington Hills, Michigan. All inquiries regarding rights should be directed to the Gale Group. (Hide copyright information)
|
CHUNG-LUN LI [1]
T.C.E. CHENG [2]
Traditional scheduling and due-date determination models assume that the production system is operating in a static and deterministic environment and that the system carries no workload at each scheduling epoch. In this research we consider a due-date determination model where the scheduler wishes to update the existing schedule when some new jobs have arrived into the system. In this model, jobs are categorized as either "old" or "new" jobs, where the due-dates of the old jobs are treated as given parameters and those of the new jobs are decision variables. The objective is to minimize the maximum weighted tardiness ...
Related newspaper, magazine, and journal articles:
|
|
Article: PATRICK METALS EXPANDS OPERATIONS IN MISHAWAKA, COMPANY TO CREATE ...
US Fed News Service, Including US State News;
August 9, 2006 ;
671 words
... ... building and create approximately 40 new jobs. Owned by Patrick Industries, the company ... secured commitments for more than 15,200 new jobs and $3.8 billion in private capital ... downtown Evansville that will create 150 new jobs. * Nestle will invest $359 million at ...
|
|