Article: Shotcrete Contribution at Gotthard.(design and construction of the Saint Gotthard Alp Transit rail tunnel)

Construction of the five main sections of the 57km-long Saint Gotthard AlpTransit rail tunnel project for the Swiss national rail corporation SBB, is scheduled to start in mid-late 2001. Tenders for the main tunnel contracts have been invited, proposals for the first lots are due back by the end of 2000, and first contracts are expected to be awarded in mid-2001.

In the meantime, several significant tunnel contracts are underway to prepare each access point and install the necessary infrastructure ready for speedy mobilisation of the main tunnel works. The main points of attack will be from the north portal at Erstfeld, from an adit at Amsteg, in both directions ...

Related newspaper, magazine, and journal articles:

 
 
Newsweek Harper's Magazine The Washington Post Chicago Tribune Crain's Chicago Business PRNewswire Pediatric News The Nation Advertising Age The Economist (US) A FREE trial gives you access to over 80 million articles! Access over 6,500 publications with a FREE trial!