|
|
Article: Aggressive management speeds construction of diecasting system. (Nelson Metal Products Corp.) (company profile)
- Article from:
- Modern Casting
- Article date:
- February 1, 1990
- Author:
CopyrightCOPYRIGHT 1990 American Foundry Society, Inc. This material is published under license from the publisher through the Gale Group, Farmington Hills, Michigan. All inquiries regarding rights should be directed to the Gale Group. (Hide copyright information)
|
Aggressive Management Speeds Construction of Diecasting System
The installation of a metal diecasting system is usually a lengthy procedure due to the numerous and complex steps involved. A new diecasting plant, for example, might require 18 to 36 months to move from initial planning to casting production.
Unlike many similar construction projects, however, a major addition to an aluminum diecasting plant at Nelson Metal Products Corp, Grand Rapids, MI, was planned, designed, built and fully operational in less than a year. What's more, the project cost less than had been expected.
Corporate Background
Nelson Metal Products ...