|
|
Article: Fortress Intercepts 29.7 Metres Grading 9.30 g/t Gold at Elena Prospect and 182.7 Metres Grading 1.10 g/t Gold at Amy Prospect, Svetloye Project, Russia
- Article from:
- CCNMatthews Newswire
- Article date:
- September 5, 2007
CopyrightCopyright 2007 CCNMatthews Newswire. Provided by ProQuest LLC. (Hide copyright information)
|
VANCOUVER, BRITISH COLUMBIA--(Marketwire - Sept. 5, 2007) -
Fortress Minerals Corp. ("Fortress" or "the Company")(TSX
VENTURE:FST) is pleased to announce drill results from the first 25
drill holes completed during 2007 at the Svetloye Gold Project in
Eastern Russia. Results include reconnaissance drilling at the Tamara
and Amy prospects and deposit definition drilling at the Elena
prospect. Please see attached drill results table and map.
At the Elena Prospect, drill highlights include hole PDSC-080,
which returned 29.7 metres grading 9.30 grams per tonne gold,
including 6.8 metres grading 22.80 g/t gold. Of particular
significance is the fact that this drill hole is the southernmost
hole ...