Article: COURT REPORT

[ John F Hunt Demolition Ltd ? ASME Engineering Ltd ]

* THE CASE

The issue examined in John F Hunt Demolition Ltd ? ASME Engineering Ltd [2007] EWHC 1507 (TCC) was whether a settlement amount at one level of a chain of contracts is recoverable as the measure of damages further down the chain.

The work was the construction of a building which required the demolition of the existing building. The owner was Kier Whitehall. The contractor Kier Build sub-contracted the demolition to Hunt, who in turn sub-subcontracted to ASME the construction of a temporary steel structure to support the existing facades of the property during the demolition works.

Sparks from ASME's welding work set light to ...