|
|
Article: FERC ISSUES ORDER TO ALABAMA ELECTRIC COOPERATIVE MODIFYING, APPROVING DISSOLVE OXYGEN MONITORING PLAN
- Article from:
- US Fed News Service, Including US State News
- Article date:
- October 22, 2008
CopyrightCopyright © HT Media Ltd. All Rights Reserved. Provided by ProQuest LLC. (Hide copyright information)
|
The U.S. Department of Energy's Federal Energy Regulatory Commission issued the text of the following delegated order:
Alabama Electric Cooperative, Inc.Project Nos. 2586-033 & -034
ORDER MODIFYING AND APPROVING DISSOLVE OXYGEN MONITORING PLAN UNDER ARTICLE 406 AND RESERVOIR DRAWDOWN PLAN UNDER ARTICLE 410
On April 1, 2008, Alabama Electric Cooperative, Inc. (licensee) filed its Dissolved Oxygen Monitoring Plan and Reservoir Drawdown Plan for the Conecuh River Hydroelectric Project (FERC No. 2586). The two plans are required by articles 406 and 410, respectively, as stipulated by Order Accepting Settlement and Issuing New License. [1] The Conecuh Project is located on the Conecuh River, ...