Article: NTSB DETERMINES INADEQUATE LOAD CAPACITY DUE TO DESIGN ERRORS OF GUSSET PLATES CAUSED I-35W BRIDGE TO COLLAPSE
- Article from:
- US Fed News Service, Including US State News
- Article date:
- November 14, 2008
CopyrightCopyright © HT Media Ltd. All Rights Reserved. Provided by ProQuest LLC. (Hide copyright information)
|
The National Transportation Safety Board issued the following press release:
The National Transportation Safety Board has determined the probable cause of the collapse of the I-35W bridge in Minneapolis, Minnesota, was the inadequate load capacity, due to a design error by Sverdrup & Parcel and Associates, Inc., of the gusset plates at the U10 nodes, which failed under a combination of (1) substantial increases in the weight of the bridge, which resulted from previous modifications, and (2) the traffic and concentrated construction loads on the bridge on the day of the accident.
Contributing to the design error was the failure of Sverdrup & Parcel's quality control procedures to ...