WASHINGTON, Oct. 14 -- The U.S. Department of Energy's Federal Energy Regulatory Commission issued the text of the following delegated order:
Fifth Revised Sheet No. 200A, Fourth Revised Sheet No. 366, Fourth Revised Sheet No. 387, Third Revised Sheet No. 388 to its FERC Gas Tariff, Second Revised Volume No. 1A.
El Paso Natural Gas Co., 124 FERC 61,124 (2008).
El Paso Natural Gas Co., 125 FERC 61,309, at P 183 (2008). The Commission subsequently granted El Paso two extensions of time to submit its revised flow control provision.
Id.
18 C.F.R. Section 385.210 (2009).
18 C.F.R. Section 385.214 (2009).
The Indicated Shippers include BP America Production Company; BP Energy Company; ...