|
|
Article: HEARING ON DRAFT PERMIT SCHEDULED AT REDFIELD
- Article from:
- US Fed News Service, Including US State News
- Article date:
- November 7, 2009
CopyrightCopyright © HT Media Ltd. All Rights Reserved. Provided by ProQuest LLC. (Hide copyright information)
|
LITTLE ROCK, Ark., Nov. 6 -- The Arkansas Department of Environmental Quality announced the following press release:
The Arkansas Department of Environmental Quality (ADEQ), will hold a public hearing at Redfield November 17, 2009, to receive comments on a draft permit for modifications to the air pollution control system for the White Bluff coal-fired electric generating plant operated by Entergy Arkansas, Inc. The hearing will begin at 6:00 p.m. at the American Legion Post 343 building, 800 Mark Twain Boulevard, at Redfield.
Entergy has requested a permit modification to add air pollution control equipment on two boilers at the plant. Additional storage and handling systems are also ...